harbour bridge project

Brief Description: Fully enclosed removal of existing coating and replacement with a zinc, epoxy and urethane system completed over two seasons: Summer 2007 and Summer 2008.

Crew Size: 26 tradesmen.

The Saint John Harbour Bridge carries four lanes of traffic crossing the Saint John Harbour at the mouth of the Saint John River across three spans, measuring:
– Span 1: 125 meters (410ft.)
– Span 2: 250 Meters (820ft.)
– Span 3: 125 Meters (410ft.)

It opened in 1968.